Assets Reference Public

Endorsements & Acceptance

Creating, approving and releasing the endorsement documents people sign for equipment — the four-step wizard, approval routing, responsibility terms, printable paperwork and how recipients confirm or refuse receipt.

Guide version: r1 Module version: 1.11.0 Updated: 2026-08-25 Estimated time: 5 min 4 views 0% helpful
Custody & Service

Endorsements & Acceptance

An endorsement is the paperwork behind a handover: one or more assets going to one recipient under one set of terms. It carries a reference people can quote (END-2026-0001), it prints, and it is what somebody signs.

The document's life

Draft
being written; holds nothing
Awaiting approval
only when the rules require it
Approved
cleared to hand over
Released
the equipment changes hands
In custody
the recipient confirmed
ℹ️
A draft holds nothing. Creating one does not take the equipment out of stock, and two drafts may list the same asset — whoever releases first gets it, and the other is told the asset is already in someone's custody. That is deliberate: a draft can sit for days while somebody else legitimately issues the same item.

Everything after release is a summary of the items, not a decision anybody makes: a document reads partially returned because some of its items came back, and disputed because one was refused.

Creating one

Safekeep → Custody → New endorsement. Four steps, and nothing is written until the last one, so you can move back and forth freely.

StepWhat you decide
1. RecipientWho is receiving it — a person, a place, a team, a project or an outside party — and, for anything that is not a person, who is accountable for it. See Custody for the full list.
2. ItemsThe equipment. The picker only offers assets that are actually available: nothing somebody already holds, and nothing whose status says it must not be issued.
3. TermsPurpose, expected return date, whether it is temporary, and the responsibility terms the recipient will be shown.
4. ReviewRead it back, then Create draft.
⚠️
Up to 200 items per document. Not a storage limit — a limit on what one request can carry. Beyond it the browser silently truncates the list, so the form refuses instead. Split a larger handover across several documents.

When approval is needed

Two independent rules, both settings, decided at the moment you submit — so a later change to the rules can never strand a document that was legitimately submitted under the old ones:

  • Value — the summed cost of the items reaches asset_endorsement_approval_threshold. It ships as 0, which means value never triggers approval; a company that has not thought about approval should not find documents silently stuck waiting for it.
  • Category — any item belongs to a category listed in asset_endorsement_approval_categories, whatever it is worth.

An approver can send it back with a reason instead of approving. That returns it to draft so the preparer can fix it, rather than killing the document and making them retype everything.

Releasing it

Release is the moment the equipment actually changes hands — everything before it is paperwork. At release the system:

  • claims each asset, so nothing else can be holding it;
  • freezes the responsibility terms onto the document — a copy, not a reference, so what somebody accepted stays readable years later even if the category's wording is edited or the category is deleted;
  • sets the acceptance deadline (default 3 days, changeable per release);
  • records who released it, by typed name.

Confirming receipt

The recipient confirms from the asset page, from the Custody page, or in the employee app. Where the category requires it they must tick that they have read the terms and type their full name; the record keeps the name, the time, and the address it came from.

Partial acceptance is allowed. Somebody handed five things may have received four — accepting what arrived and leaving the fifth pending is a truer record than forcing an all-or-nothing answer.

ℹ️
Confirming twice is safe. A phone that lost its connection mid-request will retry, so a second confirmation reports success without rewriting the acceptance record — the original time and signature stand.

Accepting for somebody else

Staff holding Accept on Behalf can confirm for a recipient who cannot — but it is deliberately heavier: a reason is compulsory, and the record shows plainly that it was not the recipient who signed. "The storekeeper accepted for them" and "they accepted" are different facts, and the first is the one an auditor asks about.

Refusing

A recipient can refuse equipment, and the reason is required. A refusal with no explanation is not a record anybody can act on. The asset is released back to stock immediately and the preparer is told why.

Reminders

People who were issued equipment but have not confirmed receipt are chased once as the deadline approaches — once, not nightly, because a reminder that arrives every day is a reminder people filter to a folder they never open.

The printed document

Print produces the signable paperwork: the reference, both parties, every item with its tag, serial and condition, the responsibility terms as they were at release, and signature lines for the issuer and the recipient. Where somebody has already confirmed in the system, their name and date are filled in.

Was this guide helpful?

Report a content problem